Here's Day Two of the build, as you can see I put in the checkerboard floor, which is made of pieces of cardboard glued down, base coated black and then the raised sections were highlighted in white/grey tones.
Most of the "bricks" which are broken up popsicle sticks were placed in the gaps and then base coated with a dirty red/brown. I also put in the two staircases (man I hate stair cases) which was down by tilting the model on it's back or side and gluing the treads down.
We sure got a lot accomplished today, even started putting in the first room on the Third floor (see last photo).
not a bad day at all, except for the very real leak we've just discovered in our actual roof
A.Shay Hahn
No comments:
Post a Comment